Information Grid Listings

 

Date Image URL
07. 15. 08Far Eastern End on Southern Avenue
07. 15. 08Plumes Around Cooper Drum Site
07. 15. 08TCE Plume
07. 15. 08Well Locations and TCE Plume
07. 15. 08General Plume Direction
07. 15. 08General Perspective of Conditions at Cooper Drum
07. 15. 08East Entrance of Cooper Drum
07. 15. 08Cooper Drum Site Location
07. 15. 08Industrialized Area of Cooper Drum
07. 15. 08Cooper Drum Hardwash Area
07. 15. 08View down the North Alley of Cooper Drum
07. 15. 08TCE Plume on Site
07. 15. 08Northeastern Plume Co-mingling with Cooper Drum
07. 18. 08Remedial Design Tech Memo for Field Sampling_URS_7-06
07. 18. 08Cooper Drum Final ROD_US EPA_9-27-02
07. 18. 08Conceptual Site Model for Cooper Drum_ROD_Fig 5-1
07. 18. 08Deep Aquifer System and Production Wells_ROD_Fig 5-3
07. 18. 08Risk Characterization Summary
07. 18. 08Risk Characterization Summary
07. 18. 08Risk Characterization Summary
07. 18. 08Risk Characterization Summary
07. 18. 08Summary of General Comparison Info
07. 18. 08Comparative Analysis of Action Alternatives
07. 18. 08Cost Estimate Summary
07. 18. 08Cost Estimate Summary
07. 18. 08Cleanup Levels for Contaminants of Concern
07. 18. 08Soil Remedial Design Report Specifications
07. 18. 08Soil Remedial Design_OU2_Sept 2007
07. 18. 08Groundwater Remedial Design Report Specifications_OU1
07. 18. 08Groundwater Remedial Design Report_OU1_URS_Sept 2007
07. 18. 08Generalized O&M Manual for DPE_URS_Sept 2007
07. 18. 08Construction Quality Control Plan_URS_Aug 2007
07. 18. 08Mechanical Equipment Technical Information_6-04
07. 18. 08Perched Aquifer Pump Test; URS Technical Memorandum_July 2004
07. 18. 08Dual-Phase Extraction System Design Calculations
07. 18. 08SVE Pilot Test Data_URS_March 2004
07. 18. 08Groundwater Flow Model Documentation_July 2007
07. 18. 08Soil Excavation Volume Calculations_URS_Oct 2006
07. 18. 08Excavation Work Plan_Basis of Design Report_URS_March 2007
07. 18. 08ARARs Summary
07. 18. 08Remedial Design Technical Memorandum_Field Sampling_Data, Tables, Figs_July 2006
07. 18. 08Contaminants of Concern (COCs)
07. 21. 08Site Conceptual Model
07. 21. 08Site Layout with Features
07. 21. 08Aerial Photograph
07. 21. 08Superfund Process at the Cooper Drum Site
07. 21. 08Site Area has Multiple Plumes
07. 21. 08Trichloroethene Isopleth Map
07. 21. 08Dioxane Isopleth Map
07. 21. 08Alternative Evaluation Table
07. 21. 08Soil Gas and Groundwater Process Flow Diagram
07. 21. 08Site Metrics
02. 18. 09Cooper Drum Addendum Attachment 4-9
02. 18. 09Cooper Drum Addendum Attachment 1-3
02. 18. 09Cooper Drum Figures 27-33
02. 18. 09Cooper Drum Addendum Figures 10-26
02. 18. 09Cooper Drum Addendum Figures 1-9
02. 18. 09Remedial Design Technical Memorandum for Field Sampling Results
10. 27. 09PNL Cooper Drum PC Proposal
10. 27. 09PNL Cooper Drum PC Proposal Interview Presentation