Cooper Drum Superfund Site
www.prpblog.com/cooperdrum
PROJECT INFORMATION
COMPANY INFORMATION
Home
Site Overview
Site Documents
Visuals
Information Grid
Listings
About
Services
Contact
Information Grid Listings
Date
Image
URL
07. 15. 08
Far Eastern End on Southern Avenue
07. 15. 08
Plumes Around Cooper Drum Site
07. 15. 08
TCE Plume
07. 15. 08
Well Locations and TCE Plume
07. 15. 08
General Plume Direction
07. 15. 08
General Perspective of Conditions at Cooper Drum
07. 15. 08
East Entrance of Cooper Drum
07. 15. 08
Cooper Drum Site Location
07. 15. 08
Industrialized Area of Cooper Drum
07. 15. 08
Cooper Drum Hardwash Area
07. 15. 08
View down the North Alley of Cooper Drum
07. 15. 08
TCE Plume on Site
07. 15. 08
Northeastern Plume Co-mingling with Cooper Drum
07. 18. 08
Remedial Design Tech Memo for Field Sampling_URS_7-06
07. 18. 08
Cooper Drum Final ROD_US EPA_9-27-02
07. 18. 08
Conceptual Site Model for Cooper Drum_ROD_Fig 5-1
07. 18. 08
Deep Aquifer System and Production Wells_ROD_Fig 5-3
07. 18. 08
Risk Characterization Summary
07. 18. 08
Risk Characterization Summary
07. 18. 08
Risk Characterization Summary
07. 18. 08
Risk Characterization Summary
07. 18. 08
Summary of General Comparison Info
07. 18. 08
Comparative Analysis of Action Alternatives
07. 18. 08
Cost Estimate Summary
07. 18. 08
Cost Estimate Summary
07. 18. 08
Cleanup Levels for Contaminants of Concern
07. 18. 08
Soil Remedial Design Report Specifications
07. 18. 08
Soil Remedial Design_OU2_Sept 2007
07. 18. 08
Groundwater Remedial Design Report Specifications_OU1
07. 18. 08
Groundwater Remedial Design Report_OU1_URS_Sept 2007
07. 18. 08
Generalized O&M Manual for DPE_URS_Sept 2007
07. 18. 08
Construction Quality Control Plan_URS_Aug 2007
07. 18. 08
Mechanical Equipment Technical Information_6-04
07. 18. 08
Perched Aquifer Pump Test; URS Technical Memorandum_July 2004
07. 18. 08
Dual-Phase Extraction System Design Calculations
07. 18. 08
SVE Pilot Test Data_URS_March 2004
07. 18. 08
Groundwater Flow Model Documentation_July 2007
07. 18. 08
Soil Excavation Volume Calculations_URS_Oct 2006
07. 18. 08
Excavation Work Plan_Basis of Design Report_URS_March 2007
07. 18. 08
ARARs Summary
07. 18. 08
Remedial Design Technical Memorandum_Field Sampling_Data, Tables, Figs_July 2006
07. 18. 08
Contaminants of Concern (COCs)
07. 21. 08
Site Conceptual Model
07. 21. 08
Site Layout with Features
07. 21. 08
Aerial Photograph
07. 21. 08
Superfund Process at the Cooper Drum Site
07. 21. 08
Site Area has Multiple Plumes
07. 21. 08
Trichloroethene Isopleth Map
07. 21. 08
Dioxane Isopleth Map
07. 21. 08
Alternative Evaluation Table
07. 21. 08
Soil Gas and Groundwater Process Flow Diagram
07. 21. 08
Site Metrics