PRPblog Home

Cooper Drum Superfund Site

www.prpblog.com/cooperdrum

  • PROJECT INFORMATION
  • COMPANY INFORMATION
  • Home
  • Site Overview
  • Site Documents
  • Visuals
  • Information Grid
  • Listings
  • About
  • Services
  • Contact

Site Documents

  • September 27, 2008 - Cooper Drum Final ROD
  • September 22, 2008 - Technical Memorandum for Field Sampling Results
    • Remedial Design Technical Memorandum for Field Sampling Results
    • Figures 1-9 Cooper Drum Addendum
    • Figures 10-26 Cooper Drum Addendum
    • Figures 27-33
    • Attachment 1-3
    • Attachment 4-9
  • September 19, 2007 - Groundwater Remedial Design Report
  • September 18, 2007 - Soil Remedial Design Report

© 2007-2009 Project Navigator, Ltd. ® All rights reserved.